MINE4710 Mine Management
UNSW Sydney· 6 credit points
Assessments
| Task | Type | Weight |
|---|---|---|
| Final Exam | Exam | 30% |
| Disaster Case Study | Assignment | 20% |
| Industrial Relations Script and Role Play | Assignment | 30% |
| Quiz | Quiz | 20% |
| Total | 100% | |
What do I need on the exam?
This unit is 30% exam. Enter your average on everything else to see the mark you need on the final.
%
HD (85%)
—
D (75%)
—
C (65%)
—
P (50%)
—
Mark needed across the exam component(s) to reach each grade.
Track MINE4710 in StudyLedger
Sign up and MINE4710 is added with its 4 assessments already filled in. Log your marks as they come back and watch your WAM update. Free, no card required.
Assessment details come from UNSW Sydney's published unit information and may change between offerings — always confirm in your official unit guide.